Electric-vehicle registrations soared 40 % last year, and the Treasury still bankrolls up to £350 per socket through the Office for Zero Emission Vehicles (OZEV) grant. For any electrician who masters EV charging point installation, that translates into visit https://elec.training/news/ev-charging-point-installation-grants-training-and-earnings-explained/ £200–£300 profit per job—often in a single morning’s work. Add in the eco-buzz and rising house values for homes with chargers, and it is clear why this niche has become the most profitable bolt-on skill in the trade.
How OZEV Funding Works
EV Homecharge Scheme (EVHS)
- Pays 75 % of unit + labour, capped at £350
- One grant per eligible vehicle, up to two per household
- Charger must be smart-enabled
Workplace Charging Scheme (WCS)
- Up to 20 dual-socket posts per firm
- £350 per socket discount
- Application starts with the employer, not the installer
Installers upload invoices and compliance photos via the OZEV portal; payments land within six weeks, according to official scheme guidance .
Four Steps to EV Charging Point Installation Success
- Join a CPS – NICEIC, NAPIT or similar.
- Complete City & Guilds 2921-31 with Elec Training (design, install, test).
- Register with every charger OEM (Rolec, Pod Point, etc.).
- Obtain your OZEV installer ID—no ID, no grant.
A 2023 peer-reviewed study in Applied Energy found that certified installers cut post-handover electrical faults by 62 % compared with generalist electricians . Qualification really does matter.
Your First Five Installations: A Proven Workflow
- Site survey – check earthing, consumer-unit capacity and Wi-Fi signal.
- Transparent quote – list price minus grant so clients see the saving.
- Documentation – photograph serial numbers and meter tails for OZEV evidence.
- Smart-tester log – record load, RCD trip times and Zs.
- Same-day submission – keep cash-flow positive.
FAQs After Your Electrician Course
Do I need separate approval for each charger brand?
Yes. The City & Guilds cert proves competence, but OEMs still run a short online induction.
Can one property claim two grants?
Yes—limit is two vehicles per household, not per address.
What’s the going rate?
Straightforward installs average £250 labour; tricky cable runs or three-phase upgrades push earnings higher.
Course Highlight: City & Guilds 2921-31 at Elec Training
Our five-day EV charging point installation module covers:
- Smart-charger diversity calculations
- BS 7671 Section 722 compliance
- OZEV paperwork walk-through
- Live testing with Rolec Charge Check + MFT
Graduates leave with an OZEV-ready portfolio and a guaranteed first placement
Create a Future-Proof Revenue Stream
Analysts forecast that half of all new cars sold by 2030 will be plug-in hybrid or fully electric. By adding EV charging point installation to your toolkit now, you lock in decade-long earning power. Book your seat today, start claiming grants tomorrow, and watch your invoice totals surge.
Ready to plug into opportunity? Full article can be read https://elec.training/news/ev-charging-point-installation-grants-training-and-earnings-explained/.